Downtown Wastewater Tunnel Redevelopment


 

3.5 miles of tunnel for the collection and transportation of wastewater from Lamar and Cesar Chavez to Kreig Fields near Pleasant Valley Road

  • Lamar shaft – 16′ diameter x 50′ deep
  • Toomey shaft – new 54″ dia. pipe tie-in
  • Five construction and access shaft/junction boxes, and tie-ins to existing shafts